| Agency | Alaska DOT |
| Treatment | 1″ Thin Highly Modified HMA |
| Route | Diamond Boulevard |
| Location Description | Anchorage |
| Description of Existing Conditions | Rutting (studded tire damage) with some longitudinal and transverse cracking. |
| ADT | >10,000 |
| Previous Pavement Treatment and Year | Mill and HMA overlay 2013 |
| Length | 1.0 Mile |
| Pre-Condition Rating | 78 out of a 1-100 scale |
| Expected Construction | 2026 |
